ebis.waterboard.lk - /documentation/agmdoc/SBD/A1_ Works Contracts/A1.20 FIDIC Construction(CP)/


[To Parent Directory]

4/5/2022 8:58 AM 194565 1. ITB - Uploaded on 05.04.2022.pdf
4/5/2022 9:05 AM 180676 3. Quailification & Evaluaion Criteria -Uploaded on 05.04.2022.pdf
4/11/2022 9:16 AM 441930 6.1 General Requirements-Uploaded on 11.04.2022.pdf
10/21/2021 10:02 AM 694155 6.2 Emp Req_GenSpec - Uploaded 15-10-2021.pdf
11/17/2021 2:11 PM 1518758 6.3 Emp Req_Civil&Build Spec - updated on 15-10-2021_PDF.pdf
10/21/2021 10:03 AM 750687 6.4 Emp Req_Electrical Spec - updated on 15-10-2021_PDF.pdf
10/21/2021 10:03 AM 1237883 6.5 Emp Req_Mechanical Spec - updated on 15-10-2021_PDF.pdf
10/15/2021 10:21 AM 603220 6.6 -6a- Water Supply Sewerage and Storm water(Chapter 3) concrete works Water Specification ICTAD - oploaded on 15.10.2021.pdf
10/21/2021 10:03 AM 158130 6.6 Emp Req_Other Specifications - updated on 15-10-2021-PDF.pdf
6/16/2022 1:04 PM 2729472 FIDIC Construction_(CP) - Uploaded on 16-06-2022.doc
6/16/2022 1:59 PM <dir> removed